Documents
Documents
D 2011.9 Pembrokeshire Railcard - english
| Date added: | 10/14/2011 |
| Date modified: | 10/14/2011 |
| Filesize: | 1.96 MB |
| Downloads: | 211 |
The Welsh version exceeds the maximum size permitted on this website. Email info@nptf.co.uk or ring 01348 874217 to obtain a copy from the Forum Secretary.
D 2011.10 New Fishguard Trains a Boon to Activity Centre
| Date added: | 10/03/2011 |
| Date modified: | 10/03/2011 |
| Filesize: | 87.21 kB |
| Downloads: | 136 |
Mathry outdoor activity centre Preseli Venture's weekend break clients now travel by train to Fishguard. Promotional posters and leaflets now being displayed in trains and stations.
D 2011.092 Ministerial Launch of New Fishguard Train Services
| Date added: | 09/28/2011 |
| Date modified: | 09/28/2011 |
| Filesize: | 85.22 kB |
| Downloads: | 147 |
Speeches by Carl Sargeant AM (Welsh Government Minister for Local Government and Communities), Mike Bagshaw (Arriva Trains Wales Commercial Director), Mark Langman (Network Rail Wales Route Managing Director), Cllr Jamie Adams (Vice-Chair South West Wales Integrated Transport Consortium - SWWITCH) and Hatti Woakes (Secretary North Pembrokeshire Transport Forum).
D 2011.082 New Fishguard Trains Timetable - expanded version
| Date added: | 08/16/2011 |
| Date modified: | 08/16/2011 |
| Filesize: | 88.56 kB |
| Downloads: | 383 |
Includes Sunday timetables. Connecting services shown in separate columns.
D 2011.081 New Fishguard Trains Timetable - abbreviated version
| Date added: | 08/16/2011 |
| Date modified: | 08/16/2011 |
| Filesize: | 21.86 kB |
| Downloads: | 158 |
Includes timetables 'from' and 'to' Fishguard, Monday to Fridays, from 12th September 2011.











